Back to All Blogs
Roofing Tips

Is Your Midwest Crew Leaving Money on the Table?

Jan 26, 2026 7 min read
Is Your Midwest Crew Leaving Money on the Table?

Watching three separate crews idle in an Indianapolis parking lot at 7:14 AM because of a simple logistical oversight is a quick way to see $1,142 in labor costs evaporate before the first shingle is pulled. I was standing there with Devin, a contractor who had built a solid $4.2 million business but was struggling to maintain a net profit margin above 9.4%. The culprit wasn't his sales team or his material costs. It was the "whiteboard shuffle," a chaotic morning ritual where crews waited for instructions while Devin tried to figure out which job site was actually ready for a tear-off. We spent the next four hours auditing his previous month's logs and found that "wait time" and "travel overlap" were costing him nearly $9,400 every single month.

16.4%
Average revenue lost to poor crew scheduling and travel inefficiency in mid-sized roofing firms.

Main Points

Implementing a 14-day rolling schedule prevents the "morning bottleneck" that drains labor hours.

Route optimization in the Midwest region can reduce fuel and vehicle maintenance costs by 12.8% annually.

Transitioning to real-time digital job tracking allows for mid-day adjustments when weather or material delays occur.

The High Cost of the Midwest "Morning Bottleneck"

In the roofing industry, particularly across states like Ohio, Illinois, and Indiana, the weather is your most volatile business partner. When a storm front moves through the Great Lakes, it doesn't just change the forecast, it resets your entire production calendar. Contractors who rely on static scheduling often find themselves paying for "show-up time" when a roof is too slick to work on, or worse, having crews sitting on their hands while materials are stuck in transit.

According to ConsumerAffairs roofing industry statistics, the industry has grown into a $56 billion market, but that growth has tightened the labor market significantly. You cannot afford to waste the hours of the skilled laborers you have. When Devin and I looked at his data, we saw that his "yield per man-hour" was fluctuating wildly. On days when the schedule was tight, he earned $142 per man-hour. On "shuffle" days, that dropped to $87.

The first step in fixing this is moving away from the "day-of" mindset. Most Midwest owners are reactive, they check the radar at 5:00 AM and make calls. Instead, you need a proactive buffer system. This means having "B-side" work ready, such as small repair jobs or interior staging, that crews can pivot to if a primary project is delayed by 48 hours.

Scheduling Methodology Comparison

Decision Timing
Manual/Reactive
Decisions made 0-12 hours before start
Dynamic/Proactive
14-day rolling forecast with B-side jobs
Project Density
Manual/Reactive
High "dead time" between projects
Dynamic/Proactive
Tight route density for lower overhead
Crew Briefing
Manual/Reactive
Crews wait for morning instructions
Dynamic/Proactive
Crews receive digital briefs night before
Labor Efficiency
Manual/Reactive
Average 14.2% labor waste
Dynamic/Proactive
Less than 4.7% labor waste

Strategic Route Density and Labor Efficiency

One of the biggest leaks I see in Midwest operations is "geographic scattering." I've seen companies take a job in Naperville in the morning and send that same crew to Joliet in the afternoon without accounting for the 90 minutes of lost production time in traffic. When you are paying a five-man crew $35 per hour, that 90-minute move costs you $262 in straight labor, plus fuel and wear on a $65,000 truck.

Optimization starts with lead territory management. If you are buying leads that are spread across three different counties, your overhead will eat your margins alive. This is why we focus on territory locking in our platform features, ensuring that when you win a neighborhood, you can stay there.

Devin began grouping his production by zip code clusters. He realized that by sacrificing a single high-margin job that was 50 miles away, he could fit three medium-margin jobs into a single five-mile radius. His net profit actually increased by 6.2% because his crews were spending 47 more minutes per day actually on the roof rather than in the cab of a Ford F-350.

The 15-Minute Rule for Midwest Crews

"Never let a crew leave the yard without a 15-minute digital briefing sent the night before. This brief should include the site map, material drop location, and specific safety hazards. This eliminates the "huddle" time at the shop and gets them on the roof by 7:30 AM sharp."

The 14-Day Production Framework

Scaling a roofing business requires a shift from being a "roofer with a crew" to a "production manager with a system." I helped a shop in Des Moines implement what I call the 14-Day Production Framework. This isn't just a list of names on a calendar, it is a living document that accounts for material lead times, permit approvals, and crew specialties.

Action Plan

Implementing the 14-Day Production Framework

A step-by-step process to stabilize your labor costs and improve project turnaround times.

1

The Lead Validation Audit: Every Friday, audit all upcoming jobs for the next two weeks to ensure permits are pulled and materials are confirmed at the supply house.

2

Assign Specialty Crews: Don't put a shingle crew on a standing seam metal job just to keep them busy. Match the skill set to the project 10 days out to maximize speed.

3

The Weather Pivot: Identify "interior-only" or "low-slope" tasks that can be performed during marginal weather windows common in the Midwest.

4

The 24-Hour Confirmation: Send an automated text to the homeowner 24 hours before arrival to ensure the driveway is clear and the site is accessible.

5

Post-Job Data Review: Every Monday, compare the "estimated man-hours" vs. "actual man-hours" for the previous week's jobs to refine future bidding.

Want to skip the manual work and get exclusive, verified leads instead?

Get $150 in Free Credits

During this process, it is vital to keep safety at the forefront. Rapid scheduling can lead to cutting corners, which is why we always integrate the OSHA Stop Falls framework into the daily briefing. A single accident doesn't just hurt a worker, it can halt your entire production schedule for weeks and skyrocket your insurance premiums.

Transitioning to High-Quality Lead Flow

You cannot optimize a schedule if your lead pipeline is inconsistent. I've spoken with hundreds of owners who have their crews sitting home on a Thursday because a "guaranteed" lead source dried up or sent them four "no-shows" in a row. This is the exact frustration that led to the founding of our company, as detailed in our about page. We saw contractors losing thousands in overhead because they couldn't trust their calendar.

To run an optimized crew, you need a "locked" pipeline. When you know exactly how many verified, exclusive jobs are coming in, you can hire with confidence and schedule with precision. Using a system where you can preview job details before buying allows you to select leads that fit your existing geographic clusters, further improving your route density and profit per mile.

The Over-Scheduling Trap

Avoid the temptation to book your crews at 100% capacity. In the Midwest, a 15% "buffer" is necessary to account for equipment failure and rain delays. Over-scheduling leads to burnout, high turnover, and sloppy installs that result in expensive callbacks.

Measuring Success: The Metrics That Matter

If you want to know if your scheduling is actually improving, you have to look at the numbers. Stop looking only at total revenue. Instead, track these three metrics:

  1. Labor Burden Ratio: The total cost of your field labor (including taxes and insurance) divided by your gross profit. In a healthy Midwest shop, this should stay below 32%.
  2. Drive Time Percentage: Total man-hours spent in vehicles versus total man-hours on-site. If this exceeds 18%, your route density is failing.
  3. Schedule Adherence: The percentage of jobs that start and finish on the originally assigned date.

When Devin started tracking these, he realized his labor burden was actually 41% due to poor scheduling. By tightening his geographic focus and using a digital dispatch system, he brought that down to 29.4% within six months. That difference alone added over $185,000 to his bottom line by the end of the fiscal year.

Common Questions

Start by showing them how it saves them time. When they don't have to wait 45 minutes at the shop every morning, they get home to their families earlier. Tie their performance bonuses to the data logged in the system.
Share